About 14 months, estimated completion in March or April, 2012
About CHF 51 million
The entire main structure will be split into basically two uses: a six-floor office section(basement, ground floor, and 1st trough 4th floors) and a three-floor production hall (basement, ground floor, and 1st floor).
The basement of the production hall is equal in height to the basement of the office section; the ground floor of the production hall occupies the entire structural height of three office floors (ground floor, 1st floor, and 2nd floor). The uneven rooflines of the office section and production hall are due to the permissible building heights and the terrain dropping away to the southeast.
The underground area being built during phase 1 of the main structure (submitted as a separate, general construction request on June 4, 2010) is designed as a parking garage.